Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1655540.015
Citation: 02001A
Citation Type: Repeat
Abatement Status: Abatement Completed
Initial Penalty: $156,259.00
Current Penalty: $125,000.00
Issuance Date: 09/08/2023
Nr Instances: 4
Nr Exposed: 6
Abatement Date: 10/06/2023
Gravity: 10
Report ID: 0636900
Contest Date: 09/29/2023
Final Order: 06/28/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/28/2024 | $125,000.00 | 10/06/2023 | Repeat | |
Penalty | C: Contested | 09/29/2023 | $156,259.00 | 10/06/2023 | Willful | |
Penalty | Z: Issued | 09/08/2023 | $156,259.00 | 10/06/2023 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): On or about March 9, 2023, pulley(s) with rotating parts seven feet or less from the floor were not guarded against physical contact, exposing employees to caught-in-between hazards in the following instances (a-d): a) Unguarded tail pulley located on the Northwest Corner of the Pre-Clean Building. b) Unguarded tail pulley located at the Northern end of the 5/8 Building. c) Unguarded tail pulley located at the South end of the 5/8 Building, near operator station, and d) Unguarded tail pulley located in the Optical Building, adjacent to the elevated Operator Station.