Violation Detail
Standard Cited: 19260652 C04 I Requirements for protective systems.
Inspection Nr: 1634933.015
Citation: 02001A
Citation Type: Repeat
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $137,508.00
Current Penalty: $80,000.00
Issuance Date: 05/16/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/19/2023
Gravity: 10
Report ID: 0626300
Contest Date: 06/08/2023
Final Order: 12/05/2023
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/05/2023 | $80,000.00 | 12/19/2023 | Repeat | |
Penalty | C: Contested | 06/12/2023 | $137,508.00 | 06/12/2023 | Willful | |
Penalty | Z: Issued | 05/16/2023 | $137,508.00 | 06/12/2023 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1926.652(c)(4)(i): Support systems, shield systems, and other protective systems not utilizing Option 1, Option 2 or Option 3, above, were not approved by a registered professional engineer: (a) On or about November 17, 2022, and at times prior to, at the Throckmorton Sewer Trunk Line Extension Project, the system used for trench cave-in protection was not in accordance with the registered professional engineer's specifications.