Violation Detail
Standard Cited: 19100217 E01 I C Mechanical power presses.
Inspection Nr: 1488817.015
Citation: 02001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $986.00
Current Penalty: $0.00
Issuance Date: 02/12/2021
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 03/11/2021
Gravity:
Report ID: 0627100
Contest Date:
Final Order: 03/16/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/16/2021 | $0.00 | 03/11/2021 | Other | |
Penalty | Z: Issued | 02/12/2021 | $986.00 | 03/11/2021 | Other |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.217(e)(1)(i)(C):Records were not maintained for each inspection, maintenance and/ or repair task performed which included the date of inspection, maintenance or repair work, signature of the person who performed the inspection, maintenance or repair work and the serial number or other identifier of the power press inspected, maintained or repaired: On or about August 15, 2020, in workshop, the employer did not maintain records for the inspection, maintenance and/or repair of the mechanical power press - Walsh W-856A that could expose employees to amputation hazards.