Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100217 E01 I C Mechanical power presses.

Inspection Nr: 1488817.015

Citation: 02001A

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $986.00

Current Penalty: $0.00

Issuance Date: 02/12/2021

Nr Instances: 1

Nr Exposed: 8

Abatement Date: 03/11/2021

Gravity:

Report ID: 0627100

Contest Date:

Final Order: 03/16/2021

Related Event Code (REC): R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 03/16/2021 $0.00 03/11/2021 Other  
Penalty Z: Issued 02/12/2021 $986.00 03/11/2021 Other  

Text For Citation: 02 Item/Group: 001A Hazard:

29 CFR 1910.217(e)(1)(i)(C):Records were not maintained for each inspection, maintenance and/ or repair task performed which included the date of inspection, maintenance or repair work, signature of the person who performed the inspection, maintenance or repair work and the serial number or other identifier of the power press inspected, maintained or repaired: On or about August 15, 2020, in workshop, the employer did not maintain records for the inspection, maintenance and/or repair of the mechanical power press - Walsh W-856A that could expose employees to amputation hazards.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.