Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1189968.015
Citation: 02001A
Citation Type: Willful
Abatement Date: 05/03/2017 2
Initial Penalty: $43,456.00
Current Penalty: $13,037.00
Issuance Date: 04/21/2017
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 05/09/2017
Final Order: 03/16/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/16/2018 | $13,037.00 | 05/03/2017 | Willful | |
Penalty | C: Contested | 05/16/2017 | $43,456.00 | 05/03/2017 | Willful | |
Penalty | Z: Issued | 04/21/2017 | $43,456.00 | 05/03/2017 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) On or about 10/31/2016, In the facility: The marked emergency exit door located in the South East corner of the building was locked with a padlock.