Violation Detail
Standard Cited: 19100303 B07 General.
Inspection Nr: 995405.015
Citation: 02001
Citation Type: Other
Abatement Date: 11/07/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/24/2014
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 11/07/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/07/2014 | $0.00 | 11/07/2014 | Other | |
Penalty | Z: Issued | 10/24/2014 | $0.00 | 11/07/2014 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(b)(7): Mechanical execution of work. Electric equipment shall be installed in a neat and workmanlike manner: a) On or about 9/16/2014 there was an electrical cord with an outlet suspended from an overhead beam secured with a nylon wire tie which defeated the ceiling strain relief system at the junction box near column Q81. b) On or about 9/16/2014 there was an electrical cord with an outlet attached that was secured to a metal tube with nylon wire ties which defeated the strain relief system for the electrical cord at the ceiling.