Violation Detail
Standard Cited: 19100022 B01 General requirements.
This violation item has been deleted.
Inspection Nr: 943092.015
Citation: 02001
Citation Type: Other
Abatement Date: 04/25/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/01/2014
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0316100
Contest Date:
Final Order: 04/22/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/22/2014 | $0.00 | 04/25/2014 | Other | |
Penalty | Z: Issued | 04/01/2014 | $0.00 | 04/25/2014 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.22(b)(1): Aisles and passageways were not kept clear and in good repair, with no obstruction across or in aisles that could create a hazard. a) Mechanical Room G028 - A 24-inch long copper tube was located approximately 6 inches above the floor and running across a walkway used by employees to access the air conditioning reset controls, on or about October 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.