Violation Detail
Standard Cited: 19261413 A04 II B
Inspection Nr: 907840.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $56,000.00
Current Penalty: $60,000.00
Issuance Date: 11/07/2013
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 12/03/2013
Gravity: 10
Report ID: 0420100
Contest Date: 11/26/2013
Final Order: 07/03/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 07/03/2016 | $60,000.00 | 12/03/2013 | Willful | |
| Penalty | C: Contested | 12/11/2013 | $56,000.00 | 12/03/2013 | Willful | |
| Penalty | Z: Issued | 11/07/2013 | $56,000.00 | 12/03/2013 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.1413(a)(4)(ii)(B): 29 CFR 1926.1413(a)(4)(ii)(B): When a deficiency in Category II was identified, operations involving use of the wire rope in question was not prohibited until the wire rope was replaced. a) Hwy 109 @ Cumberland River - On or about 5/21/13, damaged cables were not removed from service. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).