Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 897952.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/16/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/22/2013
Gravity:
Report ID: 0420600
Contest Date:
Final Order: 06/03/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/03/2013 | $0.00 | 05/22/2013 | Other | |
| Penalty | Z: Issued | 05/16/2013 | $0.00 | 05/22/2013 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(5)(i): Visible gauges or audible alarms or pressure activated devices were not installed to indicate or insure that the required air velocity is maintained: a. Spray booth - the JBI Manometer mounted on the side of the spray booth was not operational. Violation observed on or about 03/27/13.