Violation Detail

Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.

Inspection Nr: 897952.015

Citation: 02001

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 05/16/2013

Nr Instances: 1

Nr Exposed: 2

Abatement Date: 05/22/2013

Gravity:

Report ID: 0420600

Contest Date:

Final Order: 06/03/2013

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 06/03/2013 $0.00 05/22/2013 Other  
Penalty Z: Issued 05/16/2013 $0.00 05/22/2013 Other  

Text For Citation: 02 Item/Group: 001 Hazard:

29 CFR 1910.107(b)(5)(i): Visible gauges or audible alarms or pressure activated devices were not installed to indicate or insure that the required air velocity is maintained: a. Spray booth - the JBI Manometer mounted on the side of the spray booth was not operational. Violation observed on or about 03/27/13.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.