Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 710378.015
Citation: 02001
Citation Type: Other
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/15/2013
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 04/23/2013
Gravity:
Report ID: 0418300
Contest Date: 05/06/2013
Final Order: 02/07/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 02/07/2014 | $0.00 | 04/23/2013 | Other | |
| Penalty | C: Contested | 05/09/2013 | $0.00 | 04/23/2013 | Other | |
| Penalty | Z: Issued | 04/15/2013 | $0.00 | 04/23/2013 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process. (a) On or about 11/9/12 - at the Morris Chillers on the roof, the P&ID (Drawing No. PSM 23, Morrise Chiller) for chillers with a revision date of R4 8/16/11 was not accurate in that the Morris chiller identified as Rechiller 1 on the equipment was identified as RWC-4 (ME-15) on the drawing and as RWC-1A on the Refrigeration Department's red line drawing. (b) On or about 11/9/12 - at the Morris Chillers on the roof, the P&ID (Drawing No. PSM 23, Morrise Chiller) for chillers with a revision date of R4 8/16/11 was not accurate in that the Morris chiller identified as Rechiller 2 on the equipment was identified as RWC-3 (ME-14) on the drawing and as RWC-2A on the Refrigeration Department's red line drawing.