Violation Detail
Standard Cited: 19100179 J02 III Overhead and gantry cranes.
Inspection Nr: 543720.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/11/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/15/2013
Gravity:
Report ID: 0521400
Contest Date:
Final Order: 01/30/2013
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/30/2013 | $0.00 | 02/15/2013 | Other | |
| Penalty | Z: Issued | 01/11/2013 | $0.00 | 02/15/2013 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.179(j)(2)(iii): Monthly inspections of hooks, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected, were not performed. a. 2011A Cell Area for Mori Drilling Machine. The employer did not complete certification records of the monthly inspections of the hoist hooks. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1910.19(c).
Translate