Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 445406.015
Citation: 02001
Citation Type: Willful
Abatement Date: 12/14/2012 2
Initial Penalty: $63,000.00
Current Penalty: $63,000.00
Issuance Date: 11/19/2012
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): C
Gravity: 10
Report ID: 0213900
Contest Date: 12/05/2012
Final Order: 06/13/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 06/13/2013 | $63,000.00 | 12/14/2012 | Willful | |
Penalty | C: Contested | 12/15/2012 | $63,000.00 | 12/14/2012 | Willful | |
Penalty | Z: Issued | 11/19/2012 | $63,000.00 | 12/14/2012 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Facility - The employer did not utilize procedures for the control of hazardous energy for machines such as but not limited to the Stamtec GL-200 hydraulic press, Stamtec GL-60 hydraulic press, Minister No. 6 mechanical press, and Autoformer, on or about 5/21/12. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.