Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 316961531
Citation: 02001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $3,150.00
Current Penalty: $1,800.00
Issuance Date: 01/21/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/02/2014
Gravity:
Report ID: 1055360
Contest Date: 02/03/2014
Final Order: 04/08/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Y: State Decision | 04/08/2014 | $1,800.00 | 01/02/2014 | Serious | |
| Penalty | Z: Issued | 01/21/2014 | $3,150.00 | 01/02/2014 | Serious |