Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 315463885
Citation: 02001
Citation Type: Willful
Abatement Status: X
Initial Penalty: $49,000.00
Current Penalty: $25,000.00
Issuance Date: 09/15/2011
Nr Instances: 5
Nr Exposed: 8
Abatement Date: 09/23/2011
Gravity: 10
Report ID: 0215000
Contest Date: 09/27/2011
Final Order: 05/29/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/29/2012 | $25,000.00 | 09/23/2011 | Willful | |
Penalty | Z: Issued | 09/15/2011 | $49,000.00 | 09/23/2011 | Willful |