Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 314951609
Citation: 02001
Citation Type: Other
Abatement Status: X
Initial Penalty: $175.00
Current Penalty: $26.25
Issuance Date: 10/14/2010
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/18/2010
Gravity:
Report ID: 0552700
Contest Date: 10/15/2010
Final Order: 02/10/2011
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/10/2011 | $26.25 | 10/18/2010 | Other | |
| Penalty | Z: Issued | 10/14/2010 | $175.00 | 10/18/2010 | Other |
Translate