Standard Cited: 5A0001 OSH Act General Duty Paragraph

Inspection Nr: 313634263

Citation: 02001

Citation Type: Repeat

Abatement Status: X

Initial Penalty: $33,000.00

Current Penalty: $23,100.00

Issuance Date: 05/02/2011

Nr Instances: 4

Nr Exposed: 5

Abatement Date: 05/26/2011

Gravity: 05

Report ID: 0419400

Contest Date: 05/26/2011

Final Order: 07/27/2011

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 07/27/2011 $23,100.00 05/26/2011 Repeat  
Penalty Z: Issued 05/02/2011 $33,000.00 05/26/2011 Repeat  

Text For Citation: 02 Item/Group: 001 Hazard: LIFTING

THE PARKER HANNIFIN CORPORATION WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD 5(a)(1) WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 311413462 CITATION NUMBER 01, ITEM NUMBER 001, ISSUED ON 03/04/2008 WITH A FINAL ORDER DATE OF 03/19/2008, WITH RESPECT TO A WORKPLACE LOCATED AT 8225 HACKS CROSS RD, OLIVE BRANCH, MS. Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck-by hazards by loads being carried by Below-the-Hook Lifting Devices that were not inspected, tested, and marked to show the load rating and manufacturing specifications as to; The below-the-hook lifting devices used on hoists to lift metal coils and the lifting device used on the overhead crane on the clean line were not inspected, tested, marked as required in ASME B30.20-2006, Section 20-1.2.1(a), Section 20-1.2.1(b) and listed with the following: -Rated load [as described in para 20-1.2.1(a)] -Manufacturer's name and address -Serial number -Lifter weight, if over 100 lbs (45 kg) -Cold current (amps) and rated voltage (if applicable) -ASME BTH-1 Design Category and Service Class (a)On or about November 10, 2010 near the automatic end former, the lifting device used on the 1 ton Valustar hoist used to lift coils weighing up to 500 pounds was not inspected, tested, or marked. The top bar on the lifting device was bent. (b)On or about November 10, 2010 at the clean line, the lifting device used on the P&H overhead crane was not inspected, tested, or marked. (c)On or about December 1, 2010 near the 3/8 coupling area, the 1/2 ton hoist used to lift coils weighing up to 500 pounds was not inspected, tested, or marked. The top bar on the lifting device was bent. (d)On or about December 1, 2010 at the 5/8 to 3/4 saw cutter, the 1 ton Dayton hoist used to lift metal coils weighing up to 500 pounds was not inspected, tested, or marked. The top bar on the lifting device was bent. Among others, one feasible and useful abatement method to correct these hazards is to; mark or affix an identification plate to the device which includes the information required and perform inspection as required by ASME B30.20-2006.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.