Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313421265
Citation: 02001
Citation Type: Other
Abatement Status: I
Initial Penalty: $100.00
Current Penalty: $70.00
Issuance Date: 06/30/2009
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/04/2009
Gravity:
Report ID: 0552700
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/01/2009 | $70.00 | 07/04/2009 | Other | |
| Penalty | Z: Issued | 06/30/2009 | $100.00 | 07/04/2009 | Other |
Translate