Violation Detail
Standard Cited: 19100119 D03 ID Process safety management of highly hazardous chemicals.
Inspection Nr: 311418057
Citation: 02001
Citation Type: Other
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 05/15/2009
Nr Instances: 6
Nr Exposed: 100
Abatement Date: 08/02/2009
Gravity: 01
Report ID: 0419400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/08/2009 | 08/02/2009 | Other | ||
| Penalty | Z: Issued | 05/15/2009 | 07/02/2009 | Other |
Text For Citation: 02 Item/Group: 001 Hazard: REFINERY
29 CFR 1910.119(d)(3)(i)(D): Process safety information pertaining to the equipment in the process did not include the relief system design and design basis: (a)Plant # 16 and Plant # 81- On or about 01/20/09 a review of pressure relief device (PRD) sizing information for PRD-9210, PRD-966, PRD-9236, PRD-5121, PFD- 5027 and PRD-5071 revealed that existing sizing parameters, such as fluid prosperities, surface area calculations, operating pressures/temperatures did not reflect current conditions