Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.

Inspection Nr: 311217426

Citation: 02001

Citation Type: Other

Abatement Status: I

Initial Penalty:

Current Penalty:

Issuance Date: 07/17/2009

Nr Instances: 4

Nr Exposed: 27

Abatement Date: 07/22/2009

Gravity: 01

Report ID: 0830100

Contest Date:

Final Order:

Related Event Code (REC):

Emphasis:



Text For Citation: 02 Item/Group: 001 Hazard: REFINERY

29 CFR 1910.119(d)(3)(i)(B) The employer did not compile process safety information which included accurate piping and instrument diagrams (P&IDs). a) No gauge as listed on P&ID 34A-004-D on the line from X-29 to the orifice chamber prior to X-353. The gauge (PG 120) had been removed and the 3/4" line had been capped. b) As listed on P&ID 34A-004-D at the bottom of the cone for X-353 the 3" y'ed stub line that should have been blind-flanged actually had a flange and reducer with a pipe extension and connector to a 3/4" open ended pipe. c) P&ID 34A-004-D: two 3/4" bypass level transmitter lines were not shown that were physically located on the south end of D-10. d) Valve 34-01 not shown as "LO" on P&ID 34A-005-D.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.