Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 310609326
Citation: 02001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $600.00
Current Penalty: $600.00
Issuance Date: 02/14/2007
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/18/2006
Gravity:
Report ID: 1055340
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate