Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 307554329
Citation: 02001
Citation Type: Willful
Abatement Status: I
Initial Penalty: $55,000.00
Current Penalty: $49,500.00
Issuance Date: 08/31/2004
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/03/2004
Gravity: 02
Report ID: 0418600
Contest Date: 09/17/2004
Final Order: 02/14/2005
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/14/2005 | $49,500.00 | 09/03/2004 | Willful | |
| Penalty | Z: Issued | 08/31/2004 | $55,000.00 | 09/03/2004 | Willful |
Translate