Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 304383177
Citation: 02001
Citation Type: Unclass
Abatement Status: I
Initial Penalty: $55,000.00
Current Penalty: $44,000.00
Issuance Date: 01/31/2003
Nr Instances: 2
Nr Exposed: 22
Abatement Date: 02/05/2003
Gravity: 03
Report ID: 0216000
Contest Date: 02/25/2003
Final Order: 05/30/2003
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/30/2003 | $44,000.00 | 02/05/2003 | Unclass | |
| Penalty | Z: Issued | 01/31/2003 | $55,000.00 | 02/05/2003 | Willful |
Translate