Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 303554083
Citation: 02001
Citation Type: Serious
Abatement Status: I
Initial Penalty: $1,250.00
Current Penalty: $1,250.00
Issuance Date: 06/19/2001
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 06/22/2001
Gravity: 03
Report ID: 0454510
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate