Violation Detail
Standard Cited: 19100022 D01 General requirements.
Inspection Nr: 282013.015
Citation: 02001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/10/2012
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity:
Report ID: 0216000
Contest Date: 09/07/2012
Final Order: 03/29/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/29/2013 | $0.00 | Other | ||
| Penalty | C: Contested | 09/11/2012 | $0.00 | Other | ||
| Penalty | Z: Issued | 08/10/2012 | $0.00 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.22(d)(1): In every building or other structure, or part thereof, used for mercantile, business, industrial, or storage purposes, the loads approved by the building official were not marked in a conspicuous place in each space to which they related: On or about 3/15/12 Location: 1364 Inwood Avenue, Bronx, NY 10452 a) A office area was framed out in the corner of the open shop area. The office was not part of the original structure and had a flat roof/ceiling. There was no sign indicating the maximum load that could be placed on the ceiling/roof. Tubular welded scaffold frames were being stored on the roof/ceiling. NOTE: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Translate