Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1813604.015
Citation: 02001
Citation Type: Willful
Abatement Status:
Initial Penalty: $141,865.00
Current Penalty: $141,865.00
Issuance Date: 07/31/2025
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 08/21/2025
Gravity: 5
Report ID: 0523300
Contest Date: 08/20/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 08/20/2025 | $141,865.00 | 08/21/2025 | Willful | |
Penalty | Z: Issued | 07/31/2025 | $141,865.00 | 08/21/2025 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) On or about March 27, 2025, the employer did not ensure that point(s) of operation on a KRB Table Bender in the Southeast corner in the Fabrication Shop was guarded to prevent employee(s) from having any part of their body in the danger zone during operating cycles. b) On or about March 27, 2025, the employer did not ensure that point(s) of operation on a RMS Table Bender on the North Wall in the Fabrication Shop was guarded to prevent employee(s) from having any part of their body in the danger zone during operating cycles.