Violation Detail
Standard Cited: 19150152 B04 General requirements.
Inspection Nr: 1783825.015
Citation: 02001
Citation Type: Other
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/22/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/16/2025
Gravity:
Report ID: 0316300
Contest Date: 05/19/2025
Final Order:
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 05/21/2025 | $0.00 | 05/16/2025 | Other | |
Penalty | Z: Issued | 04/22/2025 | $0.00 | 05/16/2025 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1915.152(b)(4): The employer failed to document an occupational hazard assessment which should have included: Occupations involved in the survey, the date in which the survey took place and the name of the person who performed the hazard assessment: a) USNS Lt. John P. Bobo: On or about October 23, 2024, the employer failed to provide, upon request, documentation that a hazard assessment of the elevator project was conducted. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.