Violation Detail
Standard Cited: 19100027 A Scaffolds and rope descent systems.
Inspection Nr: 1769993.015
Citation: 02001
Citation Type: Other
Abatement Date: 02/12/2025 2
Initial Penalty: $13,005.00
Current Penalty: $8,000.00
Issuance Date: 01/31/2025
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): A
Gravity: 5
Report ID: 0627500
Contest Date:
Final Order: 02/13/2025
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/13/2025 | $8,000.00 | 02/12/2025 | Other | |
Penalty | Z: Issued | 01/31/2025 | $13,005.00 | 02/12/2025 | Serious |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.27(a): The employer did not ensure that scaffolds used in general industry meet the requirements in 29 CFR part 1926, subpart L (Scaffolds). On or about August 20, 2024, in the dairy room; employees utilized a scissor lift to perform maintenance work without the employer providing training to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.