Violation Detail
Standard Cited: 19100252 B02 III General requirements.
Inspection Nr: 1765163.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/30/2024
Nr Instances: 1
Nr Exposed: 23
Abatement Date: 10/25/2024
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 10/22/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/22/2024 | $0.00 | 10/25/2024 | Other | |
| Penalty | Z: Issued | 09/30/2024 | $0.00 | 10/25/2024 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.252(b)(2)(iii): Workers and other persons adjacent to the welding area were not protected from the rays by noncombustible or flameproof screens or shields: a) Frame Table -121 Morgan Way, Morgantown, PA - On or about July 30, 2024, employees working outside the initial weld area were exposed to arc welding rays. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Translate