Standard Cited: 19100269 D02 III Electric Power Generation, Transmission, and Distribution.

Inspection Nr: 1748916.015

Citation: 02001

Citation Type: Willful

Abatement Status:  

Initial Penalty: $145,191.00

Current Penalty: $145,191.00

Issuance Date: 11/13/2024

Nr Instances: 2

Nr Exposed: 4

Abatement Date: 12/10/2024

Gravity: 10

Report ID: 0625400

Contest Date: 10/29/2024

Final Order:

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty C: Contested 02/12/2025 $145,191.00 12/10/2024 Willful  
Penalty Z: Issued 11/13/2024 $145,191.00 12/10/2024 Willful  

Text For Citation: 02 Item/Group: 001 Hazard:

29 CFR 1910.269(d)(2)(iii): Procedures were not developed, documented, and used for the control of potentially hazardous energy covered by paragraph (d) of this section: On or about May 13, 2024, at the Crusher Bypass Chute; a Lockout/Tagout procedure was not utilized for cleaning out the bypass chute.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.