Violation Detail
Standard Cited: 19260651 I01 Specific Excavation Requirements.
Inspection Nr: 1726460.015
Citation: 02001
Citation Type: Willful
Abatement Date: 11/26/2024 5
Initial Penalty: $104,859.95
Current Penalty: $104,859.95
Issuance Date: 07/11/2024
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 08/09/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/11/2024 | $104,859.95 | 11/26/2024 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.651(i)(1): Where the stability of adjoining buildings, walls, or other structures was endangered by excavation operations, support systems such as shoring, bracing or underpinning was not provided to ensure the stability of such structures for the protection of employees. Location: 50 Dwight St. Hanson MA. On or about 02/07/2024, an employee was exposed to caught between hazards while working in a trench adjacent to a residential structure where the soil under the structure's foundation was removed and the structure was not supported to protect against collapse.