Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1719011.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $1,165.00
Current Penalty: $466.00
Issuance Date: 03/12/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/25/2024
Gravity:
Report ID: 0112300
Contest Date:
Final Order: 04/19/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/19/2024 | $466.00 | 04/25/2024 | Other | |
Penalty | Z: Issued | 03/12/2024 | $1,165.00 | 04/25/2024 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Garage Area: On or about January 3, 2024, employees were exposed to electrical shock and burn hazards due to two extension cords being utilized as permanent wiring to provide voltage to two cord-reels above the vehicles.