Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1653922.015
Citation: 02001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/17/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 04/26/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/26/2023 | $0.00 | Other | ||
| Penalty | Z: Issued | 03/17/2023 | $0.00 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(3): Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. On or about March 2, 2023, at 3860 W Wisconsin Avenue in Grand Chute, Wisconsin, a Skyjack SJ 6826 RT scissor lift was not inspected before the work shift. Two console cables were damaged with broken protective covers and were wrapped in electrical tape.