Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1633990.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $1,253.00
Current Penalty: $1,253.00
Issuance Date: 05/02/2023
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 09/20/2023
Gravity:
Report ID: 0625700
Contest Date:
Final Order: 09/27/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/27/2023 | $1,253.00 | 09/20/2023 | Other | |
| Penalty | Z: Issued | 05/02/2023 | $1,253.00 | 06/20/2023 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): Process Safety Information pertaining to the piping and instrumentation diagrams (P&ID) was not compiled, completed and accurate. a) This violation was most recently observed on or about November 14, 2022, workers were exposed to inhalation hazards when the employer did not ensure P&ID # 56A-10030.26 showed the nitrogen purge connection located on the outlet of the blowdown box for cyclone (G-2202) at OHC Reactor#5 (R-2501). b) This violation was most recently observed on or about November 14, 2022, workers were exposed to inhalation hazards when the employer did not ensure P&ID # 56A-10041.24 showed the nitrogen purge connection located on the outlet of the blowdown box for cyclone (G-2252) at OHC Reactor#6 (R-2551).
Translate