Violation Detail
Standard Cited: 19100134 G01 I A Respiratory Protection.
Inspection Nr: 1608557.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/06/2023
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 01/26/2023
Gravity:
Report ID: 0214500
Contest Date: 02/01/2023
Final Order: 07/17/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 07/17/2023 | $0.00 | 01/26/2023 | Other | |
| Penalty | C: Contested | 02/08/2023 | $0.00 | 01/26/2023 | Other | |
| Penalty | Z: Issued | 01/06/2023 | $0.00 | 01/26/2023 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.134(g)(1)(i)(A): 29 CFR 1910.134(g)(1)(i)[A]: The employer did not prohibit a tight-fitting facepiece to be worn by employees who had facial hair that comes between the sealing surface of the facepiece and the face: a) 72 Michigan Avenue Paterson, NJ - Dip Tank Area: Employees are required to wear half face elastomeric respirators while they dip metallic pieces into dip tanks filled with corrosive electro plating solution. The employer did not prohibit a tight-fitting facepiece to be worn by employees who had facial hair that comes between the sealing surface of the facepiece and the face, on or about July 25, 2022.
Translate