Violation Detail
Standard Cited: 19100134 H01 Respiratory Protection.
Inspection Nr: 1604485.015
Citation: 02001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $10,151.40
Issuance Date: 12/08/2022
Nr Instances: 7
Nr Exposed: 7
Abatement Date: 01/27/2023
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 01/05/2023
Related Event Code (REC): C
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2023 | $10,151.40 | 01/27/2023 | Serious | |
Penalty | Z: Issued | 12/08/2022 | $14,502.00 | 01/27/2023 | Serious |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.134(h)(1): Respirators were not cleaned and disinfected using the procedures in Appendix B-2 of 29 CFR 1910.134 or equivalent procedures recommended by the respirator manufacturer: On or about August 19, 2022, in the boiler room of bead wire department, employees who had cleaned the lead pot removed their contaminated respirators without effectively cleaning and disinfecting them. Personal air monitoring of the employees cleaning the lead pot on August 19, 2022 revealed the following results: Employee; Time; actual ug/m3 exposure; 8-hr Time-weighted exposure; Comparison to 50 ug/m3 PEL a) Operator; 270 min; 2,817 ug/M3 actual; 1,584.8 ug/M3 8-hr TWA; 31.7 times the PEL b) Bead Wire Lead; 285 min; 1,791 ug/M3 actual; 1,063.6 ug/M3 8-hr TWA; 21.3 times the PEL c) Operator; 420 min; 1,339.7ug/M3 actual; 1,172.2 ug/M3 8-hr TWA; 23.4 times the PEL d) Operator; 397 min; 73.85 ug/M3 actual; 61.1 ug/M3 8-hr TWA; 1.2 times the PEL e) Operator; 255 min; 2,200 ug/M3 actual; 1,168.8 ug/M3 8-hr TWA; 3.4 times the PEL