Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1590322.015
Citation: 02001
Citation Type: Willful
Abatement Status:
Initial Penalty: $31,906.00
Current Penalty: $20,738.90
Issuance Date: 10/13/2022
Nr Instances: 4
Nr Exposed: 8
Abatement Date: 10/24/2022
Gravity: 10
Report ID: 0214500
Contest Date:
Final Order: 08/21/2023
Related Event Code (REC): C;I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2023 | $20,738.90 | 10/24/2022 | Willful | |
Penalty | Z: Issued | 10/13/2022 | $31,906.00 | 10/24/2022 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6):Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). a) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Left Side - Marshall St. Fa�ade: employees were exposed to electric hazards while installing Tyvek from a pump jack scaffold platform that was approximately 5 feet from a 13KV/26KV primary line, on or about 4/15/22 b) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Right Side - Marshall St. Fa�ade: employees were exposed to electric hazards while installing Windows from a pump jack scaffold platform that was approximately 5 feet from a 13KV/26KV/69KV primary line, on or about 4/15/22 c) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Left Side - Marshall St. Fa�ade: employees were exposed to electric hazards while installing siding from a pump jack scaffold platform that was approximately 5 feet from a 13KV primary line, on or about 5/3/22. d) At or near 361 -367 Marshall St., Paterson NJ - Pump Jack Scaffold Right Side - Marshall St. Fa�ade: employees were exposed to electric hazards while installing siding from a pump jack scaffold platform that was approximately 5 feet from a 13KV primary line, on or about 5/3/22.