Violation Detail
Standard Cited: 19100147 E03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1575631.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/20/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/07/2022
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 06/16/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/16/2022 | $0.00 | 06/07/2022 | Other | |
| Penalty | Z: Issued | 05/20/2022 | $0.00 | 06/07/2022 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(e)(3):Each lockout or tagout device was not removed from each energy isolating device by the employee who applied the device: a. Poultry Plant Control Center - On or about February 1, 2022 the maintenance technician that locked out the number 3 Cross Crax Motor and Screw Auger was not the employee that removed the lock.
Translate