Violation Detail
Standard Cited: 19040039 A02
Inspection Nr: 1569441.015
Citation: 02001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $3,915.00
Current Penalty: $2,349.00
Issuance Date: 05/13/2022
Nr Instances: 1
Nr Exposed: 90
Abatement Date:
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 05/27/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/27/2022 | $2,349.00 | Other | ||
| Penalty | Z: Issued | 05/13/2022 | $3,915.00 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1904.39(a)(2): The employer did not report an in-patient hospitalization, amputation, or loss of an eye as a result of a work-related incident to OSHA within twenty-four (24) hours. a. Main Office - The employer did not notify OSHA of an in-patient hospitalization/electrical shock within 24 hours of being admitted. The employee was admitted as an in-patient on November 18, 2021, that was not reported to OSHA until December 8, 2021.
Translate