Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1562815.015
Citation: 02001
Citation Type: Other
Abatement Date: 04/01/2022 2
Initial Penalty: $1,087.00
Current Penalty: $1,087.00
Issuance Date: 03/04/2022
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 03/30/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/30/2022 | $1,087.00 | 04/01/2022 | Other | |
Penalty | Z: Issued | 03/04/2022 | $1,087.00 | 04/01/2022 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i):The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about November 9, 2021, Port City Bakery dba Alive & Kickin' Pizza Crust had not conducted a Periodic Inspection of the Line #4 Divider procedure to include a demonstration of the procedure being evaluated.