Violation Detail
Standard Cited: 19100176 B Handling materials - general.
Inspection Nr: 1562499.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $136,736.00
Current Penalty: $87,878.60
Issuance Date: 05/05/2022
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 05/17/2022
Gravity: 5
Report ID: 0316700
Contest Date: 05/24/2022
Final Order: 09/13/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/13/2023 | $87,878.60 | 05/17/2022 | Willful | |
Penalty | C: Contested | 08/08/2022 | $136,736.00 | 05/17/2022 | Willful | |
Penalty | Z: Issued | 05/05/2022 | $136,736.00 | 05/17/2022 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.176(b): Material stored in tiers was not stacked, blocked, interlocked or limited in height so that it was stable and secure against sliding and collapse: a. In the stock room - On or about November 8 and 12, 2021, the materials were not stacked in a manner to prevent collapse, exposing employees to a caught in and struck by hazard. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.