Violation Detail
Standard Cited: 19100179 N03 VI Overhead and gantry cranes.
Inspection Nr: 1560212.015
Citation: 02001
Citation Type: Other
Abatement Date: 05/18/2022 2
Initial Penalty: $14,502.00
Current Penalty: $9,000.00
Issuance Date: 04/22/2022
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): A
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 05/20/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/20/2022 | $9,000.00 | 05/18/2022 | Other | |
Penalty | Z: Issued | 04/22/2022 | $14,502.00 | 05/18/2022 | Serious |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.179(n)(3)(vi): The operator did not avoid carrying loads over people. a) On October 25, 2021, and at times prior, at the Base Build/Base Flip Fan install station, the employer allowed employee(s) to use the Coffing underhung crane to transport a pre-assembled fixture of four fan units, where employees were permitted to walk alongside/under the pre-assembly of fans while the fixture was suspended and being transported from the staging area. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.