Violation Detail
Standard Cited: 19100253 B02 II Oxygen-fuel gas welding and cutting.
This violation item has been deleted.
Inspection Nr: 1545720.015
Citation: 02001
Citation Type: Other
Abatement Status:
Initial Penalty: $1,095.00
Current Penalty: $0.00
Issuance Date: 10/07/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/03/2021
Gravity:
Report ID: 0213900
Contest Date: 11/03/2021
Final Order: 04/29/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 04/29/2022 | $0.00 | 11/03/2021 | Other | |
Penalty | C: Contested | 11/05/2021 | $1,095.00 | 11/03/2021 | Other | |
Penalty | Z: Issued | 10/07/2021 | $1,095.00 | 11/03/2021 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.253(b)(2)(ii): Assigned storage spaces for cylinders were not located where cylinders could not be knocked over or damaged by passing or falling objects, or subject to tampering by unauthorized persons: a) American Strip Steel Inc.- Maintenance Area: A small compressed gas cylinder used for welding was not secured from being knocked over, observed on or about 08/04/2021.