Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1527867.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $136,532.00
Current Penalty: $92,000.00
Issuance Date: 10/13/2021
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 08/25/2022
Gravity: 10
Report ID: 0626300
Contest Date: 10/14/2021
Final Order: 06/15/2022
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/15/2022 | $92,000.00 | 08/25/2022 | Willful | |
Penalty | C: Contested | 11/18/2021 | $136,532.00 | 10/25/2021 | Willful | |
Penalty | Z: Issued | 10/13/2021 | $136,532.00 | 10/25/2021 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. a) Withdrawn. b) ?On or about May 5, 2021, employees did not utilize energy control procedures when replacing the tier gate push cylinder on Production Line 1.?