Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1502447.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/13/2021
Nr Instances: 1
Nr Exposed: 18
Abatement Date: 06/04/2021
Gravity:
Report ID: 0523300
Contest Date:
Final Order: 06/08/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/08/2021 | $0.00 | 06/04/2021 | Other | |
| Penalty | Z: Issued | 05/13/2021 | $0.00 | 06/04/2021 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii):The employer did not certify that periodic inspections of the energy control procedures had been performed: On or about November 14, 2020, the employer did not certify that periodic inspections of the energy control procedures, including the procedure for the Corima "Strip Feeder" press, had been performed.