Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1494438.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $53,975.00
Current Penalty: $35,000.00
Issuance Date: 01/15/2021
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/28/2021
Gravity: 10
Report ID: 0215000
Contest Date: 02/12/2021
Final Order: 07/01/2021
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/19/2021 | $53,975.00 | 01/28/2021 | Willful | |
Penalty | F: Formal Settlement | 07/01/2021 | $35,000.00 | 01/28/2021 | Willful | |
Penalty | Z: Issued | 01/15/2021 | $53,975.00 | 01/28/2021 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(3):Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: Location: 136 East 36th Street, New York, NY 10016 On or about: July 16, 2020 (a) The employer did not ensure that scaffolds and scaffold components were inspected by a competent person for defects that could affect a scaffold's structural integrity before each work shift.