Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1493823.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $644.00
Current Penalty: $500.00
Issuance Date: 01/12/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/19/2021
Gravity:
Report ID: 0627500
Contest Date:
Final Order: 01/19/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/19/2021 | $500.00 | 01/19/2021 | Other | |
| Penalty | Z: Issued | 01/12/2021 | $644.00 | 01/19/2021 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.305(b)(1)(ii):Unused openings in boxes, cabinets, or fittings were not effectively closed: On or about September 21, 2020, employees engaged in electrical generator remanufacturing operations were exposed to electrical shock hazards due to the lathe power box missing a knockout.
Translate