Violation Detail
Standard Cited: 19100176 B Handling materials - general.
Inspection Nr: 1451850.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $26,987.00
Current Penalty: $13,493.50
Issuance Date: 04/28/2020
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 05/05/2020
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order:
Related Event Code (REC): C;I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | $13,493.50 | 05/05/2020 | Willful | ||
Penalty | Z: Issued | 04/28/2020 | $26,987.00 | 05/05/2020 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.176(b): Material stored in tiers was not stacked, blocked, interlocked or limited in height so that it was stable and secure against sliding and collapse: a.)1578 Sussex Turnpike., Building 3 Randolph NJ (Warehouse) 1.) Unstable materials and supplies were stacked in tiers at an unsafe height, increasing the likelihood of collapse, which exposed employees to crushing and caught in between hazards, violation observed on or about 12/18/2019 2.). Unstable Materials and supplies continued to be stacked in tiers at an unsafe height causing the materials to collapse and tip over in the directions of aisleways, which exposed employees to crushing and caught in between hazards, on or about 01/15/2020