Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1423871.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/18/2019
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 11/14/2019
Gravity:
Report ID: 0420100
Contest Date:
Final Order: 11/13/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/13/2019 | $0.00 | 11/14/2019 | Other | |
| Penalty | Z: Issued | 10/18/2019 | $0.00 | 11/14/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables were used where run through holes in walls, ceilings, or floors: a) On or about August 14, 2019 in the employee breakroom employees were exposed to electrical hazards and the employer did not ensure a floor fan flexible cord was not run through a hole in the wall.
Translate