Violation Detail
Standard Cited: 19100147 C04 II C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1421135.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/09/2019
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 10/01/2019
Gravity:
Report ID: 0213600
Contest Date:
Final Order: 09/25/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/25/2019 | $0.00 | 10/01/2019 | Other | |
| Penalty | Z: Issued | 09/09/2019 | $0.00 | 10/01/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(C): The energy control procedure did not clearly and specifically outline the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them: a) On or about 08/09/2019; where the company's energy control procedures did not include procedures for removal by other than the person who applied the device. ABATEMENT CERTIFICATION REQUIRED
Translate