Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1411005.015
Citation: 02001
Citation Type: Willful
Abatement Date: 12/23/2019 2
Initial Penalty: $92,818.00
Current Penalty: $51,700.00
Issuance Date: 12/11/2019
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): A
Gravity: 10
Report ID: 0215800
Contest Date: 12/24/2019
Final Order: 11/18/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/18/2021 | $51,700.00 | 12/23/2019 | Willful | |
Penalty | C: Contested | 12/26/2019 | $92,818.00 | 12/23/2019 | Willful | |
Penalty | Z: Issued | 12/11/2019 | $92,818.00 | 12/23/2019 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On or about 6/25/2019, throughout the facility: Employees were removing and installing lighting components while circuits were energized. Abatement documentation is required for this item.