Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1410807.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $26,520.00
Current Penalty: $12,000.00
Issuance Date: 12/17/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/26/2019
Gravity: 10
Report ID: 0215000
Contest Date: 01/14/2020
Final Order: 03/01/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/01/2021 | $12,000.00 | 12/26/2019 | Willful | |
Penalty | C: Contested | 01/29/2020 | $26,520.00 | 12/26/2019 | Willful | |
Penalty | Z: Issued | 12/17/2019 | $26,520.00 | 12/26/2019 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) Location: 880 St. Nicholas Avenue, New York, NY 10032 On or about: June 22, 2019 (a) Employees worked from the 2nd and 3rd tiers of a 9-tier high tubular welded frame scaffold and the working platform were not fully planked.